BRANDS TEST
7 April 2026 - Brands Testing
Where do I see the brands?
Hamilton WwTW (2024)
Installation of the UK’s first containerised mid-process hydroelectric turbine on a wastewater treatment works
Renewable Energy
Wastewater Treatment and Sewerage
Victoria Embankment (2024)
Delivery of complex civils to intercept combined sewer overflows and divert into the Thames Tideway Tunnel
Wastewater Treatment and Sewerage
Strongford STW - THP & LTP (2022)
Strongford STW is a major sewage treatment works serving the population equivalent of circa 350,000 from Newcastle-under-Lyme and Stoke-on-Trent. The site’s sludge treatment facility provides a major centre for regional operations. Based on a forecast increase in population, it was identified that an increase in treatment capacity would be required to accommodate the local growth. […]
Renewable Energy
Wastewater Treatment and Sewerage
Strongford STW - THP (2018)
Strongford STW is located at the north west end of Severn Trent’s region and covers a significant catchment in and around Stoke-on-Trent with a population equivalent of 350,000. The Strongford digestion plant currently processes 34 tonnes dry solid per day (tds/day) indigenous; and 14 tds/day liquid imports which includes 7 tds/day from the recently closed […]
Renewable Energy
Wastewater Treatment and Sewerage
Mogden STW (2017)
Mogden Sewage Treatment Works is the second largest in the UK. The first phase was built between 1931 and 1935 at a cost of £1.7 million and covers an area of 55 hectares. The facility treats wastewater from a population equivalent of 1.9 million across a 60 square mile catchment area of north and west […]
Renewable Energy
Wastewater Treatment and Sewerage
Abberton Pipeline Project (2013)
Installation of 32km of pipeline to support the Abberton Scheme
Water Treatment and Supply