Rogan Josh Engineering
IS THIS THE FINAL TEST? 1-AUG-25
Added Vimeo video
Behind the scenes
Pulse – A new generation
Finham Advanced Anaerobic Digestion (2023)
Finham STW, situated near Coventry in the West Midlands, is Severn Trent’s fifth largest wastewater treatment works and treats over 115 megalitres of effluent a day from half a million people. The works processes indigenous sludge on site as well as accepting exports from local, satellite sites, producing final effluent, ‘cake’ and biogas as outputs. […]
Renewable Energy
Wastewater Treatment and Sewerage
Ballykelly WwTW (2022)
Built in the 1970s, Ballykelly WwTW was designed to serve a population of just under 8,000. However, the closure of the nearby army barracks in 2008 meant the population was halved to around 3,600, leaving the works both biologically and hydraulically oversized. A hybrid solution, comprising conventional and natural wastewater treatment processes, was designed for […]
Renewable Energy
Wastewater Treatment and Sewerage
Zouch S101a - First Time Sewerage Scheme (2020)
Zouch is a small hamlet situated along the A6006 on the border of Leicestershire and Nottinghamshire and consists of 43 properties that had no access to public sewerage. Due to the canalisation of the River Soar, the hamlet is entirely surrounded by water with the main River Soar to the South and the navigable Zouch […]
Renewable Energy
Wastewater Treatment and Sewerage
Video 1
HaloHinge
TESTING MISSING PHOTO 1
Photo test 24-Feb-26
Waterproofing
